To give you a quick look at our work, we have provided you with a few of our projects to view.
We do wish to point out at the same time, we publish out of consideration for our clients only excerpts or underlying documents, insofar as this is approved by the customer.
Bearbeitungszeitraum: November - Dezember 2004
Our Services:
Project duration: from September 2004 to January 2005
Our Services:
Client: Emsland fresh poultry, Haren
Project duration: from September 2003 to February 2004
Our Services:
Client: City of Emsdetten
Project duration: July 2003-January 2004
Our services:
Mine Slot 4 to a music samples Centre
Mine slot 9 to a Museum of Industry
Stair tower with connecting bridges
Client: City of Gelsenkirchen
Project duration: July 2003-January 2004
Our services:
Client: Film Forum Duisburg
Processing time: 2001
Our services:
Project duration: June to September 2005
Project language: English
Our service:
erformance: Belo Horizonte, MG, Brasil
Project duration: October 2005 to March 2006
Project language: English
Our service:
The plant San Marco 3 is to date the largest pellet plant worldwide, with an annual capacity of 7.5 million tons.
Project duration: March 2006 to December 2009
Command, control and execution of orders
On average, the projects ca.1.400 tons of steel, 600 tons of contaminated vacuum exhaust pipelines (up to DN 6400), up to about 250 tons of small pipes (<= DN600) and about 160 tons of equipment (pumps, vacuum pumps, valves, etc. ) processes.
Our services:
Planning and execution of English language
Our services:
Our services:
Our services:
Project language: English
Our services:
Creation of the 3D Inventor model in consultation with the customer and as a connection project to the locomotive design.
Our services:
Planning of various steel, plant and hall construction projects
Our services:
Our services:
Our services:
Our services:
Construction and design of complex pump systems for the oil/natural gas industry in the specialist areas of layout planning, piping design (with insulation and trace heating), valve selection, pressure sizing, instrumentation, explosion protection, hydraulic auxiliary systems, etc.
Our services:
Tasks as project manager :
Tasks as work package responsible system designer :
production and assembly of complex piping systems and vessels in the pharmaceutical and chemical industry as well as energy supply networks (district heating, steam and gas networks)
Duties as deputy branch manager (a.i.):
Tasks as project manager:
Tasks as Head of Technical Office:
Preparation of a major overhaul in a refinery for the oil/natural gas industry
Our services: